31. May '23, 10:27
Ad ID 4494584
KSh 1,500,000 - KSh 2,000,000

Grid-Tied: Solar System Without Batteries

Nairobi CBD, City Centre Nairobi
Description

Grid-Tied: Solar System Without Batteries.
This 3phase hybrid mppt Must 15kW Grid-tie inverter system in Rongo, Migori County_ Trina solar 54pcs 38VDC/280W supports single and unbalanced loads thanks to its three-phase four-arm inverter structure. An unbalanced load is connected to the system under the first solar radiance conditions. In the load group, there is an ohmic impedance load of 7.5kVA in yellow phase and 2.5kVA, 1.6kVA in blue and red phases.
The installation only takes 1 week with almost no interruptions to your regular operations, and everything is monitored online.
The main benefit of a grid-tied solar system is that you don't need batteries to store the electricity generated by the solar panels. This can save you money on the upfront cost of the system, as well as the maintenance costs associated with batteries. Additionally, the system automatically changes back to utility grid at night.

Contact Seller
Contact via Phone
Contact via Chat

Safety tips

  • Check reviews to make sure the person is reliable.
  • Agree on the scope of work and compensation.
  • Meet in person in a safe public place.
Read more about our safety tips
Hubble Power Engineering Co Ltd
Hubble Power Engineering Co Ltd
Member Since 10. Apr '19
Contact Seller
Contact via Phone
Contact via Chat
Report This Ad
Cancel
Contact Seller:
Stay Tuned in with Our Newsletter

We hand-pick our favorites and send you the hottest deals every week!