Final Day St. Hannah’s Schools completed | 10kVA system

Nairobi CBD, City Centre Nairobi
Description

Final Day St. Hannah’s Schools, Nairobi, successfully completed | 10kVA solar system powering the entire institution from morning to evening.
Solar off-grid system without battery costs 35% less than a typical solar system and Cuts KPLC Bills by 70% since most activities run during the day.
Solar panels, mounting structure, AC/DC cabling network systems, On-grid/grid-tie solar inverters (string inverters), and a reference power source other than the grid were technically wired to construct a solar power plant without batteries. The system combines a high PV input DC voltages to dual MPPT controllers with the ability to immediately convert solar energy from PV directly to loads.
Lead Time: 4 days.
Project Costs: kes 950,000.
Overall KPLC savings in 15 years: kes 6.5million
Yearly Depreciation % : 0.9
Lifetime Savings: kes 10million
Return on investment in under 36 Months.

Hubble Power Engineering Co Ltd
Hubble Power Engineering Co Ltd
Member Since 10. Apr '19
Contact Seller
Contact via Phone
Contact via Chat
Report This Ad
Cancel
Stay Tuned in with Our Newsletter

We hand-pick our favorites and send you the hottest deals every week!